Comments: | Bijou pause at 1643:28, water rising in Mastiff and SW Vents spitting. SW Vents on at 1644:54, Cave overflow at 1648:05, Feather on at 1648:23. Mastiff overflowed quickly, Feather Satellite on at 1648:48, Rust on, and Cave bubbling vigorously. Cave on to 2-3' at 1650:05 and Mastiff boiling 1-4 feet with heavy runoff. India covered, then Mastiff drop at 1652:15 and Bijou on at 1652:40. Feather off at 1653:05 for a duration of 4m42s. Feather restarted after being off for 59 seconds joined by Feather Satellite, Posthole, Posthole Satellite, and Slit. Restart lasted 5m36s, good vertical surging low in Giant's cone, then up to halfway up Giant's cone with runoff out the front before it became angled. |