Comments: | 1247 River Vent on. 1255 RV off to start first pause. 1252 & 1254 first minutes for Main Vent splashing before a temporary cease in splashing. 1257 saw a good sized surge inside Upper Mortar. More water was seen in UM from 1304-1307. 1306 RV on. 1313 RV off to start second pause. 1311 - 1318 MV resumed splashing. 1317 UM surge. 1319-1328 Bottom Vent in full eruption. 1327 RV on. 1331 Gold Vent on. 13?? Angle on. Water levels were excellent from the moment each vent came on. Gold's bowl was flooded. High was tall and sustained throughout the event cycle and Gold was full bodied and steady as well. Upper Mortar was definitely ready for the eruption. It roared to life with a massive surge of water that was unstoppable. |