Geyser: | Lakeshore |
Date/Time From: | 2015-08-10 @ 1500 |
Date/Time To: | 2015-08-10 @ 1520 |
Entrant: | bhoppe |
Observer: | |
Time Entered: | 2015-08-10 16:38:56 |
Time Updated: | 2015-08-10 16:41:04 |
Time Uploaded: | 2015-08-10 16:41:05 |
Submitted to: | |
Note: | Observed overflows occurred 7-9 minutes apart. This change was apparent at least 3 days ago, today was the first chance I had to confirm that overflows were less frequent than the 4-5 minute overflow cycles of 2 weeks ago. Main vent was placid; it was only reflecting the water level change in the system. The pressure pool was boiling 1-2 feet high. Highest boils occurred 1-2 minutes after overflow was reached. |