Note 5830

Geyser:Emerald Spring
Date/Time:1974-09-20 @ 1800
Entrant:research-mab
Observer:1974 log
Time Entered:2017-09-05 09:59:47
Time Uploaded:2017-10-02 14:45:06
Submitted to:
Note:09/20/1974 Emerald’s Springs – Going strong. The muddy spring appears to be down some more and the cold gas bubbler at the entrance SW of the group is dry. Several of the smaller spring are bringing up arsenic sulphides.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.