Note 6336

Geyser:Ledge
Date/Time:1972-06-08 @ 0900
Entrant:research-mab
Observer:1972 log
Time Entered:2017-09-13 10:58:46
Time Uploaded:2017-10-02 14:45:06
Submitted to:
Note:06/08/1972 Ledge was still in steam phase at 900 am with a vigorous 20 foot steam jet. A 4 foot limb was removed from the SE vent.

No comments for this note.
No confirms for this note.
No flags for this note.
No attachments for this note.