Geyser: | Ledge |
Date/Time: | 1972-06-08 @ 0900 |
Entrant: | research-mab |
Observer: | 1972 log |
Time Entered: | 2017-09-13 10:58:46 |
Time Uploaded: | 2017-10-02 14:45:06 |
Submitted to: | |
Note: | 06/08/1972 Ledge was still in steam phase at 900 am with a vigorous 20 foot steam jet. A 4 foot limb was removed from the SE vent. |